D8.2 Periodic Management Report (M06)

This document reports the main achievements in the current reporting period (M1-M6 i.e. January 1 2015 – June 30 2015) of the MyAirCoach project for the active WPs and the corresponding activities. For each WP, the objectives for the reporting period are provided by the corresponding leaders as well as an overview of the status …

Read more

D8.3 Yearly Project Periodic Report (M12)

This document reports the main achievements in the current reporting period (M1-M12 i.e. January 2015-December 2015) of the myAirCoach project for the active WPs and the corresponding activities. For each WP, the objectives for the reporting period are provided by the corresponding leaders as well as an overview of the status and progress per Task. …

Read more

D7.4 IPR Protection Plan

This document constitutes the Deliverable “D7.4 – IPR Management plan” of the myAirCoach project (Grant Agreement No.: 6436071), and presents the preliminary version of myAirCoach management of Intellectual Property (IP) measures and methodologies for ensuring adequate exploitation of project results which is planned for M24. The final version of this deliverable will be included in …

Read more

D1.4 MyAirCoach technical specifications and end-to-end architecture (Final Version)

The current deliverable derives from the work performed under the Task 1.4 and is the second updated version of D1.3 “MyAirCoach technical specifications and end-to-end architecture”. Therefore, and following the structure of D1.3 the first part of the current document lists the technical specifications of the MyAirCoach system, as they are outlined on the basis …

Read more

D8.2 Periodic Management Report (M18)

This document reports the main achievements in the current reporting period (M13-M18 i.e. January 1 2016 – June 30 2016) of the MyAirCoach project for the active WPs and the corresponding activities. For each WP, the objectives for the reporting period are provided by the corresponding leaders as well as an overview of the status …

Read more

D3.3 Working prototype with algorithms and software embedded

This report introduces the first version of the smart inhaler prototype. This prototype is implemented as an adapter that can be used with almost all standard pressurized metered dose inhaler (pmdi) asthma inhaler sprays. Strong focus was given on rapidly implementing a Minimum Viable Product (MVP) that can be used for early tests with patients …

Read more

D4.3 Computational modeling and prediction engine

This aim of this document is to describe the multi-scale model developed in the framework of T4.3 for the pulmonary system. The structural representation of the followed modelling approach is presented together with geometry processing methods, for the definition of coupled 1D-3D patient specific representation of the lung geometry. In addition, lumped model representation of …

Read more

D5.3 MyAirCoach mHealth Integrated Version (1/3)

The current deliverable derives from the work performed under Task 5.4 “System Integration” and defines the integration and testing plan for MyAirCoach system in addition to the demonstration of the first integrated version of the MyAirCoach system. Furthermore and in order to structure and facilitate the efficient collection of feedback from all work-packages of the …

Read more

D8.1 Project Reference Manual and Quality Plan

This report constitutes the Deliverable “D8.1 – Project Reference Manual and Quality Plan” of the myAirCoach project (Grant Agreement No.: 6436071), and presents the management structure, the quality procedures, and the various operational tools of the Project.The current deliverable is directly connected with “Task 8.1 Project Management” and “T8.2 Risk management and contingency planning” and …

Read more